Duijvestijn
During the project 'Duijvestijn 2012', Bakker Oilfield Supply delivered the following services and products:
- Degasser
- Flow test
At the company Duijvestijn, Bakker Oilfield Supply performed a flow test to determine the maximum flow that the well could produce. Based on the information from the flow test Bakker Oilfield Supply installed a degasser installation with a maximum capacity up to 200 m3/hour.