Züblin Warmtebedrijf Bergschenhoek

 

At the project Bergschoek everything seems to go as aspected. The production test came out with a result of more than 390 m3 of geothermal water per hour with a temperature of 62 degrees Celsius. This project will supply 15 greenhouse companies with an cumulative surface area of 600.000 m2 with geothermal energy. Our share in this extremely successful project are the production test where peaks of 450 m3 of production water were realised.